USS Bush Pri-Fly Transparent Armor Window Replacements

 IMG_4134 IMG_7908 IMG_7890 

TST Defense conducted the removal and replacement of 7 damaged windows on the primary flight control tower of the USS George H.W. Bush. NAVSEA standard items were complied with and a NAVSEA certified quality control plan was adhered to. Work items included:

  • Remove original cracked transparent armor window (TAW)
  • Clean and prepare original window frame and retainer plate for re-use
  • Chase and clean threads and replace hardware
  • Reglaze windows using new gaskets and marine grade sealants
  • Fasten with properly calibrated torque wrench to required ft-lbs
  • Package for transportation in heavy duty containers
IMG_4114  IMG_4130 IMG_4131 IMG_4132  IMG_7896 IMG_7905